Client: HWADI · Saudi Arabia
The Challenge
Football audiences arrive in waves and move fast. Layout and structure had to carry that flow safely, and every element had to be rated for outdoor conditions rather than hall conditions.
What We Delivered
Event production delivered with agency HWADI — staging, scenic build, branding production and on-site installation across the activation.
The Result
Sport activations carry public footfall and fixed kick-off times. Structures were engineered and pre-assembled so that install, not fabrication, was the only thing happening on site.








